Home | Shop OnLine | About Us | Spray Booths | Frame Racks | E-Mail Us | Tech Info | Tutorials | Financing | Shop Talk

# 4000 - Big Champ Pulling Post Instruction Manual


Making Triple Pulls
- Second Pull


Page 1 of 3


1.   Release ram pressure. At this step, first pull is locked under tension.

 


2.   Using wrench binder from CHAMP UNIBODY REPAIR SYSTEMS ACCESSORY BOARD, remove hook from one end by withdrawing cotter pin that secures it.


3.   Attach remaining hook on wrench binder to excess chain of floor anchor underneath claw sling.


4.   Obtain frame draw bar from accessory board.

2 of 3 arrow.gif (58 bytes)

Champ Manual Table of Contents

Home | Shop OnLine | About Us | Spray Booths | Frame Racks | E-Mail Us | Tech Info | Tutorials | Financing | Shop Talk