Home | Shop OnLine | About Us | Spray Booths | Frame Racks | E-Mail Us | Tech Info | Tutorials | Financing | Shop Talk

# 4000 - Big Champ Pulling Post Instruction Manual


Setting Up and Controlling Double Pulls - First Top Pull


Page 1 of 1


1.   Attach pull chains to top and bottom areas to be pulled.

 


2.   Install chain lock in front of double pull kit. This locks the bottom chain and isolates the top pull.
CLICK HERE TO REFER TO PAGE WITH THIS SET-UP. TOP PULL MUST NOT BE HEAVY WHEN BEGINNING.


3.   Depress the pump pedal and put desired pressure on the top pull.
DO NOT OVERLOAD THIS FIRST PULL.

CLICK HERE FOR DETAILS ABOUT THIS SET-UP.


4.   When desired amount of pull is made, install chain lock on upper pull. This completes first top pull.

Champ Manual Table of Contents

Home | Shop OnLine | About Us | Spray Booths | Frame Racks | E-Mail Us | Tech Info | Tutorials | Financing | Shop Talk