Home | Shop OnLine | About Us | Spray Booths | Frame Racks | E-Mail Us | Tech Info | Tutorials | Financing | Shop Talk

# 4000 - Big Champ Pulling Post Instruction Manual


Setting Up First Pull


Page 1 of 1


1.  Attach back chain to anchor and thread chain through loop at rear of pulling mechanism on post.

 


2.  Pull chain through loop.


3.  Attach other end of back chain to second anchor with chain shortener. This is a “BRIDGE” set up and gives maximum support. Use it most often.


4.  Push post forward to take up slack. This is important to keep initial pull from straining front of base brace under load.

Champ Manual Table of Contents

Home | Shop OnLine | About Our Company | Spray Booths | Frame Racks | E-Mail Us| Tech Info| Tutorials | Financing | Shop Talk